{"id":54493,"date":"2024-07-11T02:48:49","date_gmt":"2024-07-11T02:48:49","guid":{"rendered":"https:\/\/bocau.com.vn\/?p=54493"},"modified":"2024-08-17T00:54:31","modified_gmt":"2024-08-17T00:54:31","slug":"doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong","status":"publish","type":"post","link":"https:\/\/bocau.com.vn\/en\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong\/","title":{"rendered":"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong"},"content":{"rendered":"<h2 class=\"sapo\" data-role=\"sapo\">Highway 13 (city, thu Duc, Ho Chi Minh city) will be extended up to 60m in the form of BOT (build \u2013 operate \u2013 Transfer). When completed, a metropolitan area of almost 2 km2 with 45.000 residents will benefit.<\/h2>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"Highway 13 is a route connecting Ho Chi Minh city to Binh Duong province and nearby areas. Project upgrade and expand the national highway 13, starting from Binh Trieu bridge to the neighboring Binh Duong province with a total length of almost 6 km. The project has a total investment amounted to nearly 14,000 billion (about 2,300 billion\/km). In which the cost of clearance around 9.400 billion.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783198104260608\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 1.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 1.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">Highway 13 is a route connecting Ho Chi Minh city to Binh Duong province and nearby areas. Project upgrade and expand the national highway 13, starting from Binh Trieu bridge to the neighboring Binh Duong province with a total length of almost 6 km. The project has a total investment amounted to nearly 14,000 billion (about 2,300 billion\/km). In which the cost of clearance around 9.400 billion.<\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"Current highway 13, the width of the road surface ranges from 18-24 m. While highway 13 is arterial routes, so car traffic is very big, however, the infrastructure not meet your needs, upgrading and expanding highway 13 is very necessary.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-1.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783200627134464\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 2.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-1.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 2.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-1.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">Current highway 13, the width of the road surface ranges from 18-24 m. While highway 13 is arterial routes, so car traffic is very big, however, the infrastructure not meet your needs, upgrading and expanding highway 13 is very necessary.<\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"Much current ramp is down, the road surface is not flat patchwork. System traffic signs and drainage at some piece missing, or has not yet reached the standard lead to the risk of waterlogging and traffic accidents. Besides missing lanes dedicated to motorcyclists and walk. In the future, these problems will be solved when the route extended up 53-60 m, scale 8 lanes. Expected completion stage 2025-2028.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-2.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783200361336832\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 3.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-2.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 3.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-2.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">Much current ramp is down, the road surface is not flat patchwork. System traffic signs and drainage at some piece missing, or has not yet reached the standard lead to the risk of waterlogging and traffic accidents. Besides missing lanes dedicated to motorcyclists and walk. In the future, these problems will be solved when the route extended up 53-60 m, scale 8 lanes. Expected completion stage 2025-2028.<\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"The project is one of 5 projects to upgrade and expand the road presence is made in the form of investment BOT (build - operate - transfer) of Ho Chi Minh city include: expansion of highway 13 (the Binh Trieu bridge to near Binh Duong province), highway 1 (the passage from Peace to dick, Long An province), national highway 22 (from the intersection of Security Dew to the belt 3), roads North - South (from Nguyen Van Linh up to speed, Ben Luc - Long Thanh), roads, bridges, Binh Tien (from Pham Van Chi to Nguyen Van Linh).\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-3.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783200394891264\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 4.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-3.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 4.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-3.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">The project is one of 5 projects to upgrade and expand the road presence is made in the form of investment BOT (build \u2013 operate \u2013 transfer) of Ho Chi Minh city include: expansion of highway 13 (the Binh Trieu bridge to near Binh Duong province), highway 1 (the passage from Peace to dick, Long An province), national highway 22 (from the intersection of Security Dew to the belt 3), roads North \u2013 South (from Nguyen Van Linh up to speed, Ben Luc \u2013 Long Thanh), roads, bridges, Binh Tien (from Pham Van Chi to Nguyen Van Linh).<\/p>\n<\/figcaption><\/figure>\n<div id=\"admzone480458\" class=\"pushed\">\n<div id=\"zone-480458\" class=\"pushed\">\n<div id=\"share-jtgyri8j\">\n<div id=\"placement-566503\">\n<div id=\"banner-480458-566608\">\n<div id=\"slot-1-480458-566608\">\n<div id=\"ssppagebid_397\">\n<div id=\"sspbid_201011\" class=\"banner0\" data-ssp=\"sspbid_201011\" data-admssprqid=\"1e532e18-2a73-45a3-bebb-d918f189bf15115-668f44c3\" data-location=\"5\" data-width=\"undefined\" data-height=\"undefined\" data-sspdefault=\"default\"><iframe id=\"ads-place-201011\" width=\"0\" height=\"0\" data-mce-fragment=\"1\"><\/iframe><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"This is the combined form of the participation of both state and private enterprises. Specifically, the state will be responsible for planning, clearance and assistance on legal. Private businesses will invest capital and participate in the construction work. This is a common pattern and efficiency, helping to mobilize resources from social and speeding up infrastructure projects.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-4.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783201058910208\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 5.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-4.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 5.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-4.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">This is the combined form of the participation of both state and private enterprises. Specifically, the state will be responsible for planning, clearance and assistance on legal. Private businesses will invest capital and participate in the construction work. This is a common pattern and efficiency, helping to mobilize resources from social and speeding up infrastructure projects.<\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"It is known to highway 13 passages from Binh Trieu bridge to bridge Binh Phuoc ago project Binh Trieu bridge 2, is formed from the year 2001 in the form of BOT. However, the project has not been implemented by the BOT contract after it is made stops on the route exists.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-5.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783200483303424\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 6.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-5.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 6.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-5.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">It is known to highway 13 passages from Binh Trieu bridge to bridge Binh Phuoc ago project Binh Trieu bridge 2, is formed from the year 2001 in the form of BOT. However, the project has not been implemented by the BOT contract after it is made stops on the route exists.<\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"When the route is wide open, many real estate projects will benefit when located right on the main road and highway 13. Convenient transportation helps residents here move to other areas quickly. The business operations and services will also grow better because of the easy transportation of goods and market access.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-6.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783201093574656\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 7.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-6.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 7.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-6.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">When the route is wide open, many real estate projects will benefit when located right on the main road and highway 13. Convenient transportation helps residents here move to other areas quickly. The business operations and services will also grow better because of the easy transportation of goods and market access.<\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"Completed, the project will bring many significant benefits, from improving traffic circulation, enhancing the safety of traffic participants to upgrade infrastructure and increase economic value for the region. This not only helps to reduce congestion and traffic accidents, but also create favorable conditions for the development of economic and social affairs of the neighboring areas.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-7.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783201226682368\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 8.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-7.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 8.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-7.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">Completed, the project will bring many significant benefits, from improving traffic circulation, enhancing the safety of traffic participants to upgrade infrastructure and increase economic value for the region. This not only helps to reduce congestion and traffic accidents, but also create favorable conditions for the development of economic and social affairs of the neighboring areas.<\/p>\n<\/figcaption><\/figure>\n<figure class=\"VCSortableInPreviewMode\">\n<div><a class=\"detail-img-lightbox\" title=\"Next stage has not yet been upgraded, then highway 13 passages from the bridge, Vinh Binh to the intersection of Le Hong Phong (Binh Duong) long 14km has been expanded to 8 lanes (53-60m). The ramp system of modern infrastructure, including roads, bridges, flyovers, underpass, lighting, traffic signs, full and good drainage. There are also separate lanes for motorcyclists and pedestrians cause traffic ventilated, reduce congestion, even during peak hours.\" href=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-8.jpg\" target=\"_blank\" rel=\"noopener\" data-fancybox=\"img-lightbox\"><img decoding=\"async\" id=\"img_100783200491692032\" class=\"lightbox-content\" title=\"Paragraph highway is about to be nearly 14,000 billion to expand, connect Ho Chi Minh city to Binh Duong - Photo 9.\" src=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-8.jpg\" alt=\"\u0110o\u1ea1n qu\u1ed1c l\u1ed9 s\u1eafp \u0111\u01b0\u1ee3c g\u1ea7n 14.000 t\u1ef7 \u0111\u1ec3 m\u1edf r\u1ed9ng, k\u1ebft n\u1ed1i Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh v\u1edbi B\u00ecnh D\u01b0\u01a1ng- \u1ea2nh 9.\" width=\"\" height=\"\" data-author=\"\" data-original=\"https:\/\/bocau.com.vn\/wp-content\/uploads\/2024\/07\/doan-quoc-lo-sap-duoc-gan-14-000-ty-de-mo-rong-ket-noi-thanh-pho-ho-chi-minh-voi-binh-duong-54493-8.jpg\" \/><\/a><\/div><figcaption class=\"PhotoCMS_Caption\">\n<p class=\"NLPlaceholderShow\" data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">Next stage has not yet been upgraded, then highway 13 passages from the bridge, Vinh Binh to the intersection of Le Hong Phong (Binh Duong) long 14km has been expanded to 8 lanes (53-60m). The ramp system of modern infrastructure, including roads, bridges, flyovers, underpass, lighting, traffic signs, full and good drainage. There are also separate lanes for motorcyclists and pedestrians cause traffic ventilated, reduce congestion, even during peak hours.<\/p>\n<p data-placeholder=\"Nh\u1eadp ch\u00fa th\u00edch \u1ea3nh\">Source: <em>cafef.vn<\/em><\/p>\n<\/figcaption><\/figure>","protected":false},"excerpt":{"rendered":"<p>Qu\u1ed1c l\u1ed9 13 (Th\u00e0nh ph\u1ed1 Th\u1ee7 \u0110\u1ee9c, Th\u00e0nh ph\u1ed1 H\u1ed3 Ch\u00ed Minh) s\u1ebd \u0111\u01b0\u1ee3c m\u1edf r\u1ed9ng l\u00ean 60m theo h\u00ecnh th\u1ee9c BOT (X\u00e2y d\u1ef1ng &#8211; V\u1eadn h\u00e0nh &#8211; Chuy\u1ec3n giao). Khi ho\u00e0n th\u00e0nh, m\u1ed9t \u0111\u00f4 th\u1ecb r\u1ed9ng g\u1ea7n 2 km2 v\u1edbi 45.000 d\u00e2n s\u1ebd \u0111\u01b0\u1ee3c h\u01b0\u1edfng l\u1ee3i. Qu\u1ed1c l\u1ed9 13\u00a0l\u00e0 tuy\u1ebfn \u0111\u01b0\u1eddng huy\u1ebft m\u1ea1ch n\u1ed1i [&#8230;]\n","protected":false},"author":2,"featured_media":54494,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-54493","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tin-tuc"],"_links":{"self":[{"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/posts\/54493","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/comments?post=54493"}],"version-history":[{"count":3,"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/posts\/54493\/revisions"}],"predecessor-version":[{"id":54508,"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/posts\/54493\/revisions\/54508"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/media\/54494"}],"wp:attachment":[{"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/media?parent=54493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/categories?post=54493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bocau.com.vn\/en\/wp-json\/wp\/v2\/tags?post=54493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}